|
Product Detail :
|
CONSTRUCTION OF BALANCE BFL WORK ALONG IBB FROM BP NO. 1301/4-S to 1316/M (BOP HUROI and HANGARIA) FOR THE LENGTH APPROX 10.30 KM IN THE STATE OF MEGHALAYA
|
| Tender Detail : |
CONSTRUCTION OF BALANCE BFL WORK ALONG IBB FROM BP NO. 1301/4-S to 1316/M (BOP HUROI and HANGARIA) FOR THE LENGTH APPROX 10.30 KM IN THE STATE OF MEGHALAYA #*. CONSTRUCTION OF BALANCE BFL WORK ALONG IBB FROM BP NO. 1301/4-S to 1316/M (BOP HUROI and HANGARIA) FOR THE LENGTH APPROX 10.30 KM IN THE STATE OF MEGHALAYA |