Product Detail :
|
Consultancy Services of Authority’s Engineer for “Improvement Construction To 2- Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37.550 to Km 45.760 (Design Km 0.000 to Km 7.760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya
|